The Arise Project (Advanced Research and Innovation in Smart Environments) involved transforming the existing 2-storey 1600 m² Life Science Building into a 6-storey 8900 m² research and learning facility.
Much of the complex construction of the ARISE building had to be done during the height of the University’s semester. As a result, extra precautions had to be made to ensure that site deliveries, heavy machinery, and any other work that extended beyond the confines of the work area were done in a safe and supervised manner, not affecting the school or students.


